Projects – Terrexxmint
Terrexxmint

Certified Projects

Assets Built to Institutional Standard

Every project in the Terrexxmint pipeline has passed independent CI CGM certification before a single dollar of structure is applied. What you see here is verified, documented, and ready for institutional capital.

1 Active Project — Currently accepting accredited investor inquiries

C.I. Chocó Gold Metals Investments

Condoto & Nóvita, Chocó · Gold and Platinum · Concession OA4-11151

C.I. Chocó Gold Metals Investments S.A.S. operates under Mining Concession Contract No. OA4-11151, granted by the Agencia Nacional de Minería (ANM), valid until March 2054. The operation is located in the municipalities of Condoto and Nóvita, Chocó, and is authorized for the exploitation of gold and platinum.

Company
C.I. Chocó Gold Metals Investments S.A.S.
ANM Concession
OA4-11151
Location
Condoto & Nóvita, Chocó
Minerals
Au · Pt
Valid Until
March 2054
RUCOM
2024080628359
Structure
Reg D 506(c) · Token SPV
Target AUM
$12,000,000 USD

Data Room · Public Documentation

Verifiable Documentation

C.I. Chocó Gold Metals Investments S.A.S. operates with full transparency. All regulatory, environmental and social documentation is publicly verifiable with the competent Colombian authorities.

Title & Permits · Mining Legality

  • Mining Concession Contract No. OA4-11151 — ANM · Valid until 2054
  • Environmental License — Resolution No. 2328 · CODECHOCÓ
  • Works and Labor Plan (PTO) — ANM approved
  • Mining Registry Certificate (CRM) — Active
  • NI 43-101 — Current

Registrations · Corporate Transparency

  • RUCOM · RUCOM-2024080628359
  • RUT — DIAN
  • Certificate of Existence — Confecámaras
  • Mining-Environmental Policy — La Previsora S.A.
  • Transport & Custody — Brinks Colombia S.A.

Community & Territory · Social License

  • Prior Consultation — COCOMACOIRO
  • Prior Consultation — C.C. de Opogodo
  • Social Management Plan active
  • SARLAFT — OFAC, UN, INTERPOL
  • Anti-Corruption Policy + PQRS

Certification Standards

What It Takes to Enter the Pipeline

Each asset passes through the same rigorous CI CGM certification process before Terrexxmint structures a single dollar. These are the six criteria every project must meet — without exception.

01
Geological Verification (NI 43-101)
Independent reserve assessment by a certified competent professional. Only Measured and Indicated classifications accepted.
Met — NI 43-101 current
02
Legal Title & Chain of Custody
Full review of mining concession title, chain of custody and absence of liens. Concession OA4-11151 registered and active in the National Mining Registry.
Met — CRM active ANM
03
Environmental Compliance
Current environmental license, approved environmental management plan, and Zero Mercury certified operation. Resolution No. 2328 — CODECHOCÓ.
Met — Res. 2328 · Zero Mercury
04
AML & Anti-Corruption
Active SARLAFT with screening against OFAC, UN and INTERPOL lists. Published anti-corruption policy. Brinks de Colombia as certified custodian.
Met — SARLAFT · Brinks
05
Social License (Prior Consultation)
Prior consultation protocolized with COCOMACOIRO and Consejo Comunitario de Opogodo, endorsed by the Ministry of the Interior.
Met — MinInterior Colombia
06
Minimum Asset Value
Certified minimum value of $5M USD to justify the cost of structuring and meet the institutional minimum ticket requirements on the Fraxxiom platform.
Met — Target AUM $12M USD